The 230,000 square feet existing building was originally constructed by Neighborgall Construction in 1979 for Sears and was transformed into a state-of-the-art vocational training facility and career technology center. Students receive top-tier, essential education to prepare them for their futures. The available programs include Automotive Technology, Collision Repair, Welding, Machine Tool Technology, HVAC, Electrical, Carpentry, Building Facilities Maintenance, Nursing, Pharmacy Tech, Graphic Design, Lawn & Public Safety, Cosmetology, Culinary Arts, Coding & App Design, & Game Design. The space also has a Science Lab, Gymnasium, Two Commercial Kitchens (one for food service and one for instruction), a Dining Area, Administrative Offices, and multiple large storage / future use areas.
The project was a complete gut renovation, receiving new MEP, interior CMU and metal stud & drywall partition walls, polished concrete floors, ceramic tile walls and flooring, vinyl flooring, four new steel pan stair systems, one cold-formed metal framing stair system that received hardwood treads & risers, a new elevator, interior and exterior aluminum storefront and curtain wall systems, vertical and horizontal metal siding, two new main entrances to the building, and three Safe School Entrances. The site received new sewer, water, and storm systems, which included an underground stormwater detention system. Site concrete and asphalt paving were completed, as well as, a 250’ storage shed for materials storage from the trade classes. Also, two pickleball courts and a basketball court were completed. The new entrances are now two story.
Neighborgall Construction removed over 10,000 square feet of elevated floor slab to raise a portion of the main corridor and the gymnasium to the high roof elevation. Neighborgall Construction’s office and site staff maintained a close relationship with the Owner and their representatives, and the Architect throughout the project which contributed to making the two+ year long project successful for all. The Owner began occupying the building and started classes on January 7, 2026, two months ahead of the scheduled completion date.